United States βΊ Grid βΊ Interconnection queues βΊ New York
BATTERY STORAGE Β· NYISOAGRE Storage
AGRE Storage is a 125 MW battery storage request withdrawn in the NYISO interconnection queue, in Queens County, New York, connecting to ConEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- C24-342
- Grid region
- NYISO (New York)
- Utility / transmission owner
- ConEd
- Developer
- Beacon Wind Land LLC
- Connection point (POI)
- Astoria West 138 kV
- Location
- Queens County, New York
- Technology
- Battery: 125 MW
- Total requested
- 125 MW
- Queue status
- Withdrawn
- Entered queue
- 11 October 2024
Location
Marker shows the centre of Queens County; the queue data does not give exact sites.
Other requests in Queens County
- Astoria Energy StorageBattery storage Β· 100 MW Β· in study
- Harlem River YardBattery storage Β· 79.9 MW Β· in study
- Luyster Creek Energy Storage 2Battery storage Β· 79.0 MW Β· in study
- Luyster Creek Energy Storage 1Battery storage Β· 57.3 MW Β· in study
- Luyster Creek Energy Storage 3Battery storage Β· 15.0 MW Β· in study
- Astoria Energy IIGas Β· 617 MW Β· built
- Astoria Energy IIGas Β· 617 MW Β· built
- Poletti ExpansionGas Β· 500 MW Β· built
- Astoria Energy - Phase 1Gas Β· 500 MW Β· built
- Astoria Energy - Phase 1Gas Β· 500 MW Β· built
- Poletti ExpansionGas Β· 500 MW Β· built
- OW Ocean Winds East 5Offshore wind Β· 1,600 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem