BATTERY STORAGE · NYISO

Astoria Energy Storage 3

Astoria Energy Storage 3 is a 20.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Queens County, New York, connecting to ConEd.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2019 (completed)
  2. Withdrawn / abandonedJan 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
838
Grid region
NYISO (New York)
Utility / transmission owner
ConEd
Developer
NRG Astoria Storage LLC
Connection point (POI)
North Queens 27kV Substation
Location
Queens County, New York
Technology
Battery: 20.0 MW
Total requested
20.0 MW
Queue status
Withdrawn
Entered queue
9 May 2019
Withdrawn
January 2023

Location

Marker shows the centre of Queens County; the queue data does not give exact sites.

Power plants in New York · Transmission lines in New York

Other requests in Queens County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem