United States › Grid › Interconnection queues › Florida
SOLAR · SOUTHEASTSolar project FC100006, Madison County
Solar project FC100006, Madison County is a 74.9 MW solar request in interconnection study in the Southeast interconnection queue, in Madison County, Florida, connecting to Duke Energy Florida.
Queue statusIn planning
- PlanningQueued Nov 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- FC100006
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Duke Energy Florida, LLC
- Connection point (POI)
- Suwannee - Madison 115 kV
- Location
- Madison County, Florida
- Technology
- Solar: 74.9 MW
- Total requested
- 74.9 MW
- Service type
- Network resource (NRIS)
- Study phase
- Facility Study
- Queue status
- Active
- Entered queue
- 27 November 2024
- Proposed online date
- June 2028
Location
Marker shows the centre of Madison County; the queue data does not give exact sites.
Other requests in Madison County
- Solar project 344, Madison CountySolar · 74.9 MW · under construction
- Solar project FC100007, Madison CountySolar · 74.9 MW · in study
- Solar project 424D, Madison CountySolar · 74.5 MW · in study
- Solar project 288, Madison CountySolar · 74.9 MW · built
- Solar project 306, Madison CountySolar · 74.9 MW · built
- Solar project 424C, Madison CountySolar · 74.5 MW · built
- Battery storage project 618, Madison CountyBattery storage · 150 MW · withdrawn
- Solar project 220, Madison CountySolar · 74.9 MW · withdrawn
- Solar project 219, Madison CountySolar · 74.9 MW · withdrawn
- Solar project 217, Madison CountySolar · 74.5 MW · withdrawn
- Solar project 468, Madison CountySolar · 74.5 MW · withdrawn
- Solar project 443A, Madison CountySolar · 74.5 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem