United States › Grid › Interconnection queues › Florida
SOLAR · SOUTHEASTSolar project 288, Madison County
Solar project 288, Madison County is a 74.9 MW solar request built and operating in the Southeast interconnection queue, in Madison County, Florida, connecting to Duke Energy Florida.
Request details
- Queue ID
- 288
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Duke Energy Florida, LLC
- Connection point (POI)
- Birch Switching Station
- Location
- Madison County, Florida
- Technology
- Solar: 74.9 MW
- Total requested
- 74.9 MW
- Service type
- Network resource (NRIS)
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 7 October 2020
- Proposed online date
- March 2024
- Came online
- March 2024
Location
Marker shows the centre of Madison County; the queue data does not give exact sites.
Other requests in Madison County
- Solar project 344, Madison CountySolar · 74.9 MW · under construction
- Solar project FC100007, Madison CountySolar · 74.9 MW · in study
- Solar project FC100006, Madison CountySolar · 74.9 MW · in study
- Solar project 424D, Madison CountySolar · 74.5 MW · in study
- Solar project 306, Madison CountySolar · 74.9 MW · built
- Solar project 424C, Madison CountySolar · 74.5 MW · built
- Battery storage project 618, Madison CountyBattery storage · 150 MW · withdrawn
- Solar project 220, Madison CountySolar · 74.9 MW · withdrawn
- Solar project 219, Madison CountySolar · 74.9 MW · withdrawn
- Solar project 217, Madison CountySolar · 74.5 MW · withdrawn
- Solar project 468, Madison CountySolar · 74.5 MW · withdrawn
- Solar project 443A, Madison CountySolar · 74.5 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem