United States βΊ Grid βΊ Interconnection queues βΊ West Virginia
BATTERY STORAGE Β· PJMBattery storage project AH1-426, Kanawha County
Battery storage project AH1-426, Kanawha County is a 64.6 MW battery storage request withdrawn in the PJM interconnection queue, in Kanawha County, West Virginia, connecting to APS.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2025 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-426
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Developer
- Nicholas County Solar Project, LLC
- Connection point (POI)
- Gilboa-Jones Branch 138 kV IV
- Location
- Kanawha County, West Virginia
- Technology
- Battery: 64.6 MW
- Total requested
- 64.6 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 25 February 2025
- Proposed online date
- December 2023
- Withdrawn
- December 2025
Location
Marker shows the centre of Kanawha County; the queue data does not give exact sites.
Power plants in West Virginia Β· Transmission lines in West Virginia
Other requests in Kanawha County
- Solar + storage project AH2-043, Kanawha CountySolar + storage Β· 200 MW Β· in study
- Kanawna River #2Coal Β· 5.0 MW Β· built
- Kanawna River #1Coal Β· 5.0 MW Β· built
- Charleston Clean EnergyOther Β· 3.2 MW Β· built
- Charlston LFOther Β· 2.0 MW Β· built
- Solar project AG2-656, Kanawha CountySolar Β· 100 MW Β· withdrawn
- Battery storage project AH2-278, Kanawha CountyBattery storage Β· 100 MW Β· withdrawn
- Solar + storage project AH2-209, Kanawha CountySolar + storage Β· 95.0 MW Β· withdrawn
- Solar + storage project AD1-149, Kanawha CountySolar + storage Β· 19.9 MW Β· withdrawn
- Gas project O37, Kanawha CountyGas Β· 14.0 MW Β· withdrawn
- Solar project AH2-134, Kanawha CountySolar Β· 5.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem