United States βΊ Grid βΊ Interconnection queues βΊ West Virginia
SOLAR Β· PJMSolar project AG2-656, Kanawha County
Solar project AG2-656, Kanawha County is a 100 MW solar request withdrawn in the PJM interconnection queue, in Kanawha County, West Virginia, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2021 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-656
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Kanawha River - Carbondale 138 kV
- Location
- Kanawha County, West Virginia
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 31 March 2021
- Proposed online date
- December 2024
- Withdrawn
- December 2024
Location
Marker shows the centre of Kanawha County; the queue data does not give exact sites.
Power plants in West Virginia Β· Transmission lines in West Virginia
Other requests in Kanawha County
- Solar + storage project AH2-043, Kanawha CountySolar + storage Β· 200 MW Β· in study
- Kanawna River #2Coal Β· 5.0 MW Β· built
- Kanawna River #1Coal Β· 5.0 MW Β· built
- Charleston Clean EnergyOther Β· 3.2 MW Β· built
- Charlston LFOther Β· 2.0 MW Β· built
- Battery storage project AH2-278, Kanawha CountyBattery storage Β· 100 MW Β· withdrawn
- Solar + storage project AH2-209, Kanawha CountySolar + storage Β· 95.0 MW Β· withdrawn
- Battery storage project AH1-426, Kanawha CountyBattery storage Β· 64.6 MW Β· withdrawn
- Solar + storage project AD1-149, Kanawha CountySolar + storage Β· 19.9 MW Β· withdrawn
- Gas project O37, Kanawha CountyGas Β· 14.0 MW Β· withdrawn
- Solar project AH2-134, Kanawha CountySolar Β· 5.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem