BATTERY STORAGE Β· PJM

Battery storage project AH1-322, Miami County

Battery storage project AH1-322, Miami County is a 90.0 MW battery storage request withdrawn in the PJM interconnection queue, in Miami County, Ohio, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2021 (completed)
  2. Withdrawn / abandonedDec 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AH1-322
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Fostoria Central - Lemoyne 345 kV
Location
Miami County, Ohio
Technology
Battery: 90.0 MW
Total requested
90.0 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
9 September 2021
Proposed online date
December 2025
Withdrawn
December 2024

Location

Marker shows the centre of Miami County; the queue data does not give exact sites.

Power plants in Ohio Β· Transmission lines in Ohio

Other requests in Miami County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem