United States βΊ Grid βΊ Interconnection queues βΊ Ohio
SOLAR Β· PJMEldean Solar
Eldean Solar is a 178 MW solar request withdrawn in the PJM interconnection queue, in Miami County, Ohio, connecting to Dayton.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2019 (completed)
- Withdrawn / abandonedJun 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AE2-218
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dayton
- Connection point (POI)
- Eldean 138 kV
- Location
- Miami County, Ohio
- Technology
- Solar: 178 MW
- Total requested
- 178 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 21 March 2019
- Proposed online date
- December 2024
- Withdrawn
- June 2025
Location
Marker shows the centre of Miami County; the queue data does not give exact sites.
Other requests in Miami County
- Solar project AI2-159, Miami CountySolar Β· 43.5 MW Β· in study
- Onshore wind project W3-013, Miami CountyOnshore wind Β· 300 MW Β· withdrawn
- Solar project AH2-216, Miami CountySolar Β· 200 MW Β· withdrawn
- Solar project AG2-628, Miami CountySolar Β· 200 MW Β· withdrawn
- Battery storage project AH2-221, Miami CountyBattery storage Β· 100 MW Β· withdrawn
- Battery storage project AH1-322, Miami CountyBattery storage Β· 90.0 MW Β· withdrawn
- Battery storage project AH1-321, Miami CountyBattery storage Β· 54.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem