BATTERY STORAGE Β· PJM

Battery storage project AH1-321, Miami County

Battery storage project AH1-321, Miami County is a 54.0 MW battery storage request withdrawn in the PJM interconnection queue, in Miami County, Ohio, connecting to Dayton.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2021 (completed)
  2. Withdrawn / abandonedJul 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AH1-321
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dayton
Developer
Invenergy Storage Development LLC
Connection point (POI)
Eldean 138 kV
Location
Miami County, Ohio
Technology
Battery: 54.0 MW
Total requested
54.0 MW
Service type
Network resource (NRIS)
Study phase
In Progress (unknown study)
Queue status
Withdrawn
Entered queue
10 September 2021
Proposed online date
December 2025
Withdrawn
July 2025

Location

Marker shows the centre of Miami County; the queue data does not give exact sites.

Power plants in Ohio Β· Transmission lines in Ohio

Other requests in Miami County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem