United States βΊ Grid βΊ Interconnection queues βΊ South Dakota
ONSHORE WIND Β· MISOOnshore wind project J189, Minnehaha County
Onshore wind project J189, Minnehaha County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Minnehaha County, South Dakota.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2010 (completed)
- Withdrawn / abandonedJul 2012 (project stopped here)
- ConsentedJul 2012 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J189
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Anson Substation
- Location
- Minnehaha County, South Dakota
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 20 December 2010
- Agreement signed
- 12 July 2012
- Proposed online date
- December 2012
- Withdrawn
- July 2012
Location
Marker shows the centre of Minnehaha County; the queue data does not give exact sites.
Power plants in South Dakota Β· Transmission lines in South Dakota
Other requests in Minnehaha County
- Gas project G370, Minnehaha CountyGas Β· 205 MW Β· built
- Onshore wind project G764, Minnehaha CountyOnshore wind Β· 242 MW Β· withdrawn
- Onshore wind project H016, Minnehaha CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project H025, Minnehaha CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project G829, Minnehaha CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project G827, Minnehaha CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project G763, Minnehaha CountyOnshore wind Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem