United States β€Ί Grid β€Ί Interconnection queues β€Ί South Dakota

ONSHORE WIND Β· MISO

Onshore wind project G829, Minnehaha County

Onshore wind project G829, Minnehaha County is a 100 MW onshore wind request withdrawn in the MISO interconnection queue, in Minnehaha County, South Dakota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2007 (completed)
  2. Withdrawn / abandonedOct 2014 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G829
Grid region
MISO (Midcontinent)
Connection point (POI)
Split Rock 115kV Substation
Location
Minnehaha County, South Dakota
Technology
Wind: 100 MW
Total requested
100 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
16 July 2007
Withdrawn
October 2014

Location

Marker shows the centre of Minnehaha County; the queue data does not give exact sites.

Power plants in South Dakota Β· Transmission lines in South Dakota

Other requests in Minnehaha County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem