Battery storage project GEN-2019-066, Beckham County

Battery storage project GEN-2019-066, Beckham County is a 50.0 MW battery storage request withdrawn in the SPP interconnection queue, in Beckham County, Oklahoma, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2019 (completed)
  2. Withdrawn / abandonedJun 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2019-066
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
AEP
Connection point (POI)
Sweetwater 230kV substation
Location
Beckham County, Oklahoma
Technology
Battery: 50.0 MW
Total requested
50.0 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
24 May 2019
Proposed online date
May 2026
Withdrawn
June 2023

Location

Marker shows the centre of Beckham County; the queue data does not give exact sites.