United States βΊ Grid βΊ Interconnection queues βΊ Ohio
COAL Β· PJMCoal project T152, Scioto County
Coal project T152, Scioto County is a 140 MW coal request withdrawn in the PJM interconnection queue, in Scioto County, Ohio, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2008 (completed)
- Withdrawn / abandonedSep 2009 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- T152
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- North Haverhill 69kV
- Location
- Scioto County, Ohio
- Technology
- Coal: 140 MW
- Total requested
- 140 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 28 January 2008
- Proposed online date
- January 2011
- Withdrawn
- September 2009
Location
Marker shows the centre of Scioto County; the queue data does not give exact sites.
Other requests in Scioto County
- North HaverhillCoal Β· 75.0 MW Β· built
- Coal project X1-027, Scioto CountyCoal Β· 200 MW Β· withdrawn
- Solar project AC2-026, Scioto CountySolar Β· 50.0 MW Β· withdrawn
- Solar project AD1-141, Scioto CountySolar Β· 50.0 MW Β· withdrawn
- Coal project AD2-078, Scioto CountyCoal Β· 40.0 MW Β· withdrawn
- Solar project AC2-047, Scioto CountySolar Β· 18.3 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem