United States β€Ί Grid β€Ί Interconnection queues β€Ί Ohio

COAL Β· PJM

Coal project AD2-078, Scioto County

Coal project AD2-078, Scioto County is a 40.0 MW coal request withdrawn in the PJM interconnection queue, in Scioto County, Ohio, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2018 (completed)
  2. Withdrawn / abandonedOct 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AD2-078
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
N. Haverhill 69kV
Location
Scioto County, Ohio
Technology
Coal: 40.0 MW
Total requested
40.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Withdrawn
Entered queue
15 March 2018
Proposed online date
September 2020
Withdrawn
October 2020

Location

Marker shows the centre of Scioto County; the queue data does not give exact sites.

Power plants in Ohio Β· Transmission lines in Ohio

Other requests in Scioto County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem