United States βΊ Grid βΊ Interconnection queues βΊ Ohio
SOLAR Β· PJMSolar project AC2-026, Scioto County
Solar project AC2-026, Scioto County is a 50.0 MW solar request withdrawn in the PJM interconnection queue, in Scioto County, Ohio, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2017 (completed)
- Withdrawn / abandonedSep 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AC2-026
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Wakefield 138kV
- Location
- Scioto County, Ohio
- Technology
- Solar: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 30 January 2017
- Proposed online date
- June 2019
- Withdrawn
- September 2017
Location
Marker shows the centre of Scioto County; the queue data does not give exact sites.
Other requests in Scioto County
- North HaverhillCoal Β· 75.0 MW Β· built
- Coal project X1-027, Scioto CountyCoal Β· 200 MW Β· withdrawn
- Coal project T152, Scioto CountyCoal Β· 140 MW Β· withdrawn
- Solar project AD1-141, Scioto CountySolar Β· 50.0 MW Β· withdrawn
- Coal project AD2-078, Scioto CountyCoal Β· 40.0 MW Β· withdrawn
- Solar project AC2-047, Scioto CountySolar Β· 18.3 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem