United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· WESTFort Bliss
Fort Bliss is a 20.0 MW solar request withdrawn in the West interconnection queue, in El Paso County, Texas, connecting to El Paso Electric Company.
Queue statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandonedNov 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- SG-15-6-1
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- El Paso Electric Company
- Connection point (POI)
- Fort Bliss
- Location
- El Paso County, Texas
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Proposed online date
- September 2016
- Withdrawn
- November 2015
Location
Marker shows the centre of El Paso County; the queue data does not give exact sites.
Other requests in El Paso County
- Co200BBattery storage Β· 200 MW Β· agreement signed
- Sf150SBSolar + storage Β· 150 MW Β· agreement signed
- Ne100BBattery storage Β· 100 MW Β· agreement signed
- SS100SSolar Β· 100 MW Β· agreement signed
- Ne100SSolar Β· 100 MW Β· agreement signed
- SS50SSolar Β· 50.0 MW Β· agreement signed
- Ca-CO-250BBattery storage Β· 250 MW Β· in study
- Wi-Al2-199SBSolar + storage Β· 199 MW Β· in study
- Wi-Al3-199SBSolar + storage Β· 199 MW Β· in study
- Wi-Al-199SBSolar + storage Β· 199 MW Β· in study
- Ea150BBattery storage Β· 150 MW Β· in study
- Montana Units 1-4 (Gas)Gas Β· 420 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem