United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· WEST

Fort Bliss

Fort Bliss is a 20.0 MW solar request withdrawn in the West interconnection queue, in El Paso County, Texas, connecting to El Paso Electric Company.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandonedNov 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
SG-15-6-1
Grid region
West (non-ISO utilities)
Utility / transmission owner
El Paso Electric Company
Connection point (POI)
Fort Bliss
Location
El Paso County, Texas
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Proposed online date
September 2016
Withdrawn
November 2015

Location

Marker shows the centre of El Paso County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in El Paso County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem