United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· SPPSolar project GEN-2014-029, Hale County
Solar project GEN-2014-029, Hale County is a 109 MW solar request withdrawn in the SPP interconnection queue, in Hale County, Texas, connecting to SPS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2014 (completed)
- Withdrawn / abandonedOct 2014 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2014-029
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Connection point (POI)
- Cimarron Antelope 230 kV Sub
- Location
- Hale County, Texas
- Technology
- Solar: 109 MW
- Total requested
- 109 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 25 September 2014
- Proposed online date
- December 2016
- Withdrawn
- October 2014
Location
Marker shows the centre of Hale County; the queue data does not give exact sites.
Other requests in Hale County
- Black Mountain Hale GasGas Β· 991 MW Β· in study
- Old Aqueduct SolarSolar + storage Β· 512 MW Β· in study
- Onshore wind project ERAS-2025-021, Hale CountyOnshore wind Β· 500 MW Β· in study
- Old Aqueduct BattSolar + storage Β· 303 MW Β· in study
- Gas project ERAS-2025-002, Hale CountyGas Β· 217 MW Β· in study
- Elk Unit 4Gas Β· 210 MW Β· in study
- Gas project GEN-2022-147, Hale CountyGas Β· 203 MW Β· in study
- Onshore wind project GEN-2012-020, Hale CountyOnshore wind Β· 478 MW Β· built
- Gas project GEN-2012-037, Hale CountyGas Β· 203 MW Β· built
- Gas project GEN-2013-016, Hale CountyGas Β· 203 MW Β· built
- Paleo BESSOther Β· 201 MW Β· built
- Gas project GEN-2006-018, Hale CountyGas Β· 168 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem