United States › Grid › Interconnection queues › Washington
ONSHORE WIND · WESTCielo Wind Power
Cielo Wind Power is a 80.0 MW onshore wind request withdrawn in the West interconnection queue, in Klickitat County, Washington, connecting to Cielo Wind Power.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2001 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G74
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Cielo Wind Power
- Developer
- Cielo Wind Power
- Connection point (POI)
- Big Eddy 230 kV line South of Goldendale.
- Location
- Klickitat County, Washington
- Technology
- Wind: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 19 September 2001
- Proposed online date
- August 2003
Location
Marker shows the centre of Klickitat County; the queue data does not give exact sites.
Power plants in Washington · Transmission lines in Washington
Other requests in Klickitat County
- Battery storage project G0608, Klickitat CountyBattery storage · 1,200 MW · in study
- Solar + storage project G0844, Klickitat CountySolar + storage · 420 MW · in study
- Solar + storage project G0979, Klickitat CountySolar + storage · 400 MW · in study
- Solar project G1016, Klickitat CountySolar · 400 MW · in study
- Solar project G0589, Klickitat CountySolar · 381 MW · in study
- Onshore wind project G0585, Klickitat CountyOnshore wind · 313 MW · in study
- Solar project G1031, Klickitat CountySolar · 250 MW · in study
- Solar + storage project G0676, Klickitat CountySolar + storage · 250 MW · in study
- Solar + storage project G0598, Klickitat CountySolar + storage · 223 MW · in study
- Solar project G0645, Klickitat CountySolar · 200 MW · in study
- Battery storage project G0637, Klickitat CountyBattery storage · 190 MW · in study
- Solar + storage project G0843, Klickitat CountySolar + storage · 180 MW · in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem