United States βΊ Grid βΊ Interconnection queues βΊ Florida
SOLAR Β· SOUTHEASTSolar project 229, Hardee County
Solar project 229, Hardee County is a 74.5 MW solar request withdrawn in the Southeast interconnection queue, in Hardee County, Florida, connecting to Duke Energy Florida.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2018 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 229
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Masked
- Connection point (POI)
- Avon Park - South Polk
- Location
- Hardee County, Florida
- Technology
- Solar: 74.5 MW
- Total requested
- 74.5 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 18 May 2018
- Proposed online date
- December 2021
Location
Marker shows the centre of Hardee County; the queue data does not give exact sites.
Other requests in Hardee County
- Solar project 243, Hardee CountySolar Β· 74.9 MW Β· built
- Solar project 253, Hardee CountySolar Β· 74.9 MW Β· built
- Gas project 89, Hardee CountyGas Β· 966 MW Β· withdrawn
- Gas project 76, Hardee CountyGas Β· 566 MW Β· withdrawn
- Gas project 7, Hardee CountyGas Β· 525 MW Β· withdrawn
- Solar project 150, Hardee CountySolar Β· 74.9 MW Β· withdrawn
- Solar project 230, Hardee CountySolar Β· 74.5 MW Β· withdrawn
- Solar project 263, Hardee CountySolar Β· 74.5 MW Β· withdrawn
- Solar project 264, Hardee CountySolar Β· 74.5 MW Β· withdrawn
- Solar project 115, Hardee CountySolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem