πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Illinois

ONSHORE WIND Β· MISO

Onshore wind project J044, Edgar County

Onshore wind project J044, Edgar County is a 99.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Edgar County, Illinois.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2009 (completed)
  2. Withdrawn / abandonedMar 2012 (project stopped here)
  3. ConsentedMar 2012 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J044
Grid region
MISO (Midcontinent)
Connection point (POI)
Kansas substation 138 kV
Location
Edgar County, Illinois
Technology
Wind: 99.0 MW
Total requested
99.0 MW
Study phase
DPP - SIS
Queue status
Withdrawn
Entered queue
15 May 2009
Agreement signed
19 March 2012
Proposed online date
January 2012
Withdrawn
March 2012

Location

Marker shows the centre of Edgar County; the queue data does not give exact sites.

Power plants in Illinois Β· Transmission lines in Illinois

Other requests in Edgar County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem