United States β€Ί Grid β€Ί Interconnection queues β€Ί Illinois

ONSHORE WIND Β· MISO

Onshore wind project G648, Edgar County

Onshore wind project G648, Edgar County is a 101 MW onshore wind request withdrawn in the MISO interconnection queue, in Edgar County, Illinois.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2006 (completed)
  2. Withdrawn / abandonedJun 2009 (project stopped here)
  3. ConsentedJun 2009 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G648
Grid region
MISO (Midcontinent)
Connection point (POI)
Ameren Kansas Substation
Location
Edgar County, Illinois
Technology
Wind: 101 MW
Total requested
101 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
12 June 2006
Agreement signed
5 June 2009
Proposed online date
June 2006
Withdrawn
June 2009

Location

Marker shows the centre of Edgar County; the queue data does not give exact sites.

Power plants in Illinois Β· Transmission lines in Illinois

Other requests in Edgar County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem