United States › Grid › Interconnection queues › Illinois
BATTERY STORAGE · MISOBattery storage project J2587, Edgar County
Battery storage project J2587, Edgar County is a 200 MW battery storage request in interconnection study in the MISO interconnection queue, in Edgar County, Illinois, connecting to DUKE ENERGY INDIANA.
Queue statusIn planning
- PlanningQueued Sep 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Apr 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J2587
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- DUKE ENERGY INDIANA
- Connection point (POI)
- Sugar Creek - Cayuga CT 345.0kV
- Location
- Edgar County, Illinois
- Technology
- Battery: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 15 September 2022
- Proposed online date
- April 2025
Location
Marker shows the centre of Edgar County; the queue data does not give exact sites.
Other requests in Edgar County
- Battery storage project J4002, Edgar CountyBattery storage · 200 MW · in study
- Solar project J4003, Edgar CountySolar · 200 MW · in study
- Solar + storage project J2266, Edgar CountySolar + storage · 175 MW · in study
- Solar project J3797, Edgar CountySolar · 141 MW · in study
- Onshore wind project G649, Edgar CountyOnshore wind · 300 MW · withdrawn
- Onshore wind project J1675, Edgar CountyOnshore wind · 250 MW · withdrawn
- Onshore wind project G648, Edgar CountyOnshore wind · 101 MW · withdrawn
- Onshore wind project G979, Edgar CountyOnshore wind · 100 MW · withdrawn
- Onshore wind project J044, Edgar CountyOnshore wind · 99.0 MW · withdrawn
- Solar + storage project J2278, Edgar CountySolar + storage · 60.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem