United States βΊ Grid βΊ Interconnection queues βΊ Illinois
ONSHORE WIND Β· MISOOnshore wind project G979, Edgar County
Onshore wind project G979, Edgar County is a 100 MW onshore wind request withdrawn in the MISO interconnection queue, in Edgar County, Illinois.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2009 (completed)
- Withdrawn / abandonedJun 2011 (project stopped here)
- ConsentedJun 2011 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G979
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Sydney - Kansas 345 kV
- Location
- Edgar County, Illinois
- Technology
- Wind: 100 MW
- Total requested
- 100 MW
- Study phase
- DPP - SIS
- Queue status
- Withdrawn
- Entered queue
- 6 March 2009
- Agreement signed
- 7 June 2011
- Proposed online date
- August 2010
- Withdrawn
- June 2011
Location
Marker shows the centre of Edgar County; the queue data does not give exact sites.
Other requests in Edgar County
- Battery storage project J2587, Edgar CountyBattery storage Β· 200 MW Β· in study
- Battery storage project J4002, Edgar CountyBattery storage Β· 200 MW Β· in study
- Solar project J4003, Edgar CountySolar Β· 200 MW Β· in study
- Solar + storage project J2266, Edgar CountySolar + storage Β· 175 MW Β· in study
- Solar project J3797, Edgar CountySolar Β· 141 MW Β· in study
- Onshore wind project G649, Edgar CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project J1675, Edgar CountyOnshore wind Β· 250 MW Β· withdrawn
- Onshore wind project G648, Edgar CountyOnshore wind Β· 101 MW Β· withdrawn
- Onshore wind project J044, Edgar CountyOnshore wind Β· 99.0 MW Β· withdrawn
- Solar + storage project J2278, Edgar CountySolar + storage Β· 60.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem