United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

GEOTHERMAL Β· WEST

Geothermal project TCS-41, Beaver County

Geothermal project TCS-41, Beaver County is a 31.1 MW geothermal request withdrawn in the West interconnection queue, in Beaver County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2019 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedMay 2023 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
TCS-41
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Developer
Intermountain Renewable Power, LLC
Connection point (POI)
South Milford substation
Location
Beaver County, Utah
Technology
Geothermal: 31.1 MW
Total requested
31.1 MW
Service type
NRIS and ERIS
Study phase
LGIA executed 5/25/2023, LGIA terminated 1/3/2025
Queue status
Withdrawn
Entered queue
9 September 2019
Agreement signed
25 May 2023
Proposed online date
May 2026

Location

Marker shows the centre of Beaver County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Beaver County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem