United States βΊ Grid βΊ Interconnection queues βΊ Iowa
COAL Β· MISOCoal project G719, Wapello County
Coal project G719, Wapello County is a 600 MW coal request withdrawn in the MISO interconnection queue, in Wapello County, Iowa.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2006 (completed)
- Withdrawn / abandonedJan 2007 (project stopped here)
- ConsentedJan 2007 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G719
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Ottumwa Generating Station
- Location
- Wapello County, Iowa
- Technology
- Coal: 600 MW
- Total requested
- 600 MW
- Queue status
- Withdrawn
- Entered queue
- 13 December 2006
- Agreement signed
- 23 January 2007
- Proposed online date
- October 2010
- Withdrawn
- January 2007
Location
Marker shows the centre of Wapello County; the queue data does not give exact sites.
Other requests in Wapello County
- Onshore wind project J3713, Wapello CountyOnshore wind Β· 200 MW Β· in study
- Battery storage project J4173, Wapello CountyBattery storage Β· 199 MW Β· in study
- Solar project J4086, Wapello CountySolar Β· 120 MW Β· in study
- Battery storage project J4172, Wapello CountyBattery storage Β· 99.0 MW Β· in study
- Coal project G718, Wapello CountyCoal Β· 900 MW Β· withdrawn
- Other project G129, Wapello CountyOther Β· 600 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem