BATTERY STORAGE · MISOBattery storage project J4172, Wapello County
Battery storage project J4172, Wapello County is a 99.0 MW battery storage request in interconnection study in the MISO interconnection queue, in Wapello County, Iowa.
Queue statusIn planning
- PlanningQueued Oct 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J4172
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Ottumwa Generating St. 161 kV
- Location
- Wapello County, Iowa
- Technology
- Battery: 99.0 MW
- Total requested
- 99.0 MW
- Service type
- Network resource (NRIS)
- Queue status
- Active
- Entered queue
- 7 October 2025
- Proposed online date
- December 2028
Location
Marker shows the centre of Wapello County; the queue data does not give exact sites.
Other requests in Wapello County
- Onshore wind project J3713, Wapello CountyOnshore wind · 200 MW · in study
- Battery storage project J4173, Wapello CountyBattery storage · 199 MW · in study
- Solar project J4086, Wapello CountySolar · 120 MW · in study
- Coal project G718, Wapello CountyCoal · 900 MW · withdrawn
- Other project G129, Wapello CountyOther · 600 MW · withdrawn
- Coal project G719, Wapello CountyCoal · 600 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem