United States βΊ Grid βΊ Interconnection queues βΊ Iowa
OTHER Β· MISOOther project G129, Wapello County
Other project G129, Wapello County is a 600 MW other request withdrawn in the MISO interconnection queue, in Wapello County, Iowa.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2001 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G129
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Unknown
- Location
- Wapello County, Iowa
- Technology
- Other: 600 MW
- Total requested
- 600 MW
- Queue status
- Withdrawn
- Entered queue
- 6 September 2001
- Proposed online date
- June 2007
Location
Marker shows the centre of Wapello County; the queue data does not give exact sites.
Other requests in Wapello County
- Onshore wind project J3713, Wapello CountyOnshore wind Β· 200 MW Β· in study
- Battery storage project J4173, Wapello CountyBattery storage Β· 199 MW Β· in study
- Solar project J4086, Wapello CountySolar Β· 120 MW Β· in study
- Battery storage project J4172, Wapello CountyBattery storage Β· 99.0 MW Β· in study
- Coal project G718, Wapello CountyCoal Β· 900 MW Β· withdrawn
- Coal project G719, Wapello CountyCoal Β· 600 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem