United States › Grid › Interconnection queues › Virginia
COAL · PJMVirginia City Hybrid Energy Center
Virginia City Hybrid Energy Center is a 80.0 MW coal request built and operating in the PJM interconnection queue, in Wise County, Virginia, connecting to AEP.
Request details
- Queue ID
- S100
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Clinch River 138kV
- Location
- Wise County, Virginia
- Technology
- Coal: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Operational
- Entered queue
- 31 July 2007
- Proposed online date
- March 2012
- Came online
- March 2012
Location
Marker shows the centre of Wise County; the queue data does not give exact sites.
Other requests in Wise County
- Solar project AH1-227, Wise CountySolar · 51.3 MW · in study
- Solar project AH1-348, Wise CountySolar · 10.0 MW · in study
- Virginia City Hybrid Energy Center - 1 UnitCoal · 534 MW · built
- Virginia City Hybrid Energy CenterCoal · 12.0 MW · built
- Onshore wind project LGE-GIS-2008-001, Wise CountyOnshore wind · 129 MW · withdrawn
- Solar project LGE-GIS-2022-002, Wise CountySolar · 40.0 MW · withdrawn
- Solar project LGE-GIS-2021-022, Wise CountySolar · 20.0 MW · withdrawn
- Solar project LGE-GIS-2021-026, Wise CountySolar · 20.0 MW · withdrawn
- Solar project LGE-GIS-2021-027, Wise CountySolar · 10.0 MW · withdrawn
- Solar project LGE-GIS-2021-021, Wise CountySolar · 10.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem