United States › Grid › Interconnection queues › Virginia

COAL · PJM

Virginia City Hybrid Energy Center

Virginia City Hybrid Energy Center is a 12.0 MW coal request built and operating in the PJM interconnection queue, in Wise County, Virginia, connecting to AEP.

Queue statusOperating
  1. PlanningQueued Sep 2012 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingMar 2014 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
Y2-067
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Clinch River 138kV
Location
Wise County, Virginia
Technology
Coal: 12.0 MW
Total requested
12.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
28 September 2012
Proposed online date
November 2012
Came online
March 2014

Location

Marker shows the centre of Wise County; the queue data does not give exact sites.

Power plants in Virginia · Transmission lines in Virginia

Other requests in Wise County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem