United States βΊ Grid βΊ Interconnection queues βΊ North Dakota
BATTERY STORAGE Β· MISOBattery storage project J3266, Sargent County
Battery storage project J3266, Sargent County is a 175 MW battery storage request withdrawn in the MISO interconnection queue, in Sargent County, North Dakota, connecting to OTTER TAIL POWER COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3266
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- OTTER TAIL POWER COMPANY
- Connection point (POI)
- Forman 230 kV Substation
- Location
- Sargent County, North Dakota
- Technology
- Battery: 175 MW
- Total requested
- 175 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 11 April 2024
- Proposed online date
- August 2028
- Withdrawn
- December 2025
Location
Marker shows the centre of Sargent County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Other requests in Sargent County
- Battery storage project GEN-2024-034, Sargent CountyBattery storage Β· 175 MW Β· in study
- Battery storage project J2913, Sargent CountyBattery storage Β· 90.0 MW Β· in study
- Onshore wind project H088, Sargent CountyOnshore wind Β· 150 MW Β· withdrawn
- Battery storage project J2094, Sargent CountyBattery storage Β· 100 MW Β· withdrawn
- Battery storage project J2896, Sargent CountyBattery storage Β· 80.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem