United States › Grid › Interconnection queues › North Dakota
BATTERY STORAGE · MISOBattery storage project J2913, Sargent County
Battery storage project J2913, Sargent County is a 90.0 MW battery storage request in interconnection study in the MISO interconnection queue, in Sargent County, North Dakota, connecting to OTTER TAIL POWER COMPANY.
- PlanningQueued Sep 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Apr 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J2913
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- OTTER TAIL POWER COMPANY
- Connection point (POI)
- Forman 115kV Substation
- Location
- Sargent County, North Dakota
- Technology
- Battery: 90.0 MW
- Total requested
- 90.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 15 September 2022
- Proposed online date
- April 2025
Location
Marker shows the centre of Sargent County; the queue data does not give exact sites.
Power plants in North Dakota · Transmission lines in North Dakota
Other requests in Sargent County
- Battery storage project GEN-2024-034, Sargent CountyBattery storage · 175 MW · in study
- Battery storage project J3266, Sargent CountyBattery storage · 175 MW · withdrawn
- Onshore wind project H088, Sargent CountyOnshore wind · 150 MW · withdrawn
- Battery storage project J2094, Sargent CountyBattery storage · 100 MW · withdrawn
- Battery storage project J2896, Sargent CountyBattery storage · 80.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem