United States βΊ Grid βΊ Interconnection queues βΊ Illinois
OTHER Β· MISOOther project J1828, Sangamon County
Other project J1828, Sangamon County is a 99.2 MW other request withdrawn in the MISO interconnection queue, in Sangamon County, Illinois, connecting to AMEREN ILLINOIS.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2020 (completed)
- Withdrawn / abandonedMar 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1828
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN ILLINOIS
- Connection point (POI)
- Austin-1 138 kV substation
- Location
- Sangamon County, Illinois
- Technology
- Solar: 99.2 MW Β· Wind Β· Battery
- Total requested
- 99.2 MW
- Service type
- Energy only (ERIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 25 June 2020
- Proposed online date
- August 2024
- Withdrawn
- March 2021
Location
Marker shows the centre of Sangamon County; the queue data does not give exact sites.
Other requests in Sangamon County
- Gas project J955, Sangamon CountyGas Β· 1,165 MW Β· under construction
- Solar project J3418, Sangamon CountySolar Β· 220 MW Β· in study
- Battery storage project J2532, Sangamon CountyBattery storage Β· 200 MW Β· in study
- Battery storage project J3515, Sangamon CountyBattery storage Β· 200 MW Β· in study
- Solar project J2659, Sangamon CountySolar Β· 150 MW Β· in study
- Lincoln Capital Land LLC Solar ProjectSolar Β· 128 MW Β· in study
- Solar + storage project J2886, Sangamon CountySolar + storage Β· 115 MW Β· in study
- Solar project J1610, Sangamon CountySolar Β· 100 MW Β· in study
- Solar + storage project J2474, Sangamon CountySolar + storage Β· 100 MW Β· in study
- Battery storage project J3892, Sangamon CountyBattery storage Β· 50.0 MW Β· in study
- Coal project G412, Sangamon CountyCoal Β· 200 MW Β· built
- Onshore wind project J038, Sangamon CountyOnshore wind Β· 498 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem