United States βΊ Grid βΊ Interconnection queues βΊ Washington
ONSHORE WIND Β· WESTOnshore wind project G0210, Lincoln County
Onshore wind project G0210, Lincoln County is a 75.0 MW onshore wind request withdrawn in the West interconnection queue, in Lincoln County, Washington.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2005 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G0210
- Grid region
- West (non-ISO utilities)
- Connection point (POI)
- Grand Coulee-Bell 115 kV line, north of Reardan, WA.
- Location
- Lincoln County, Washington
- Technology
- Wind: 75.0 MW
- Total requested
- 75.0 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 15 September 2005
- Proposed online date
- October 2006
Location
Marker shows the centre of Lincoln County; the queue data does not give exact sites.
Power plants in Washington Β· Transmission lines in Washington
Other requests in Lincoln County
- Wind + storage project CS24-15, Lincoln CountyWind + storage Β· 300 MW Β· agreement signed
- Solar project CS23-13, Lincoln CountySolar Β· 40.0 MW Β· agreement signed
- Onshore wind project G0953, Lincoln CountyOnshore wind Β· 600 MW Β· in study
- Onshore wind project G0955, Lincoln CountyOnshore wind Β· 350 MW Β· in study
- Onshore wind project G0954, Lincoln CountyOnshore wind Β· 350 MW Β· in study
- Solar + storage project G0985, Lincoln CountySolar + storage Β· 225 MW Β· in study
- Solar project 103, Lincoln CountySolar Β· 40.0 MW Β· in study
- Solar project 71, Lincoln CountySolar Β· 1.0 MW Β· in study
- Gas project 41, Lincoln CountyGas Β· 0.3 MW Β· in study
- Battery storage project 74, Lincoln CountyBattery storage Β· 0.1 MW Β· built
- Onshore wind project G0860, Lincoln CountyOnshore wind Β· 300 MW Β· withdrawn
- Solar + storage project 112, Lincoln CountySolar + storage Β· 190 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem