United States › Grid › Interconnection queues › Florida
SOLAR · SOUTHEASTSolar project 282, Bay County
Solar project 282, Bay County is a 74.9 MW solar request built and operating in the Southeast interconnection queue, in Bay County, Florida, connecting to Duke Energy Florida.
Request details
- Queue ID
- 282
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Duke Energy Florida, LLC
- Connection point (POI)
- Ladybug Substation
- Location
- Bay County, Florida
- Technology
- Solar: 74.9 MW
- Total requested
- 74.9 MW
- Service type
- Network resource (NRIS)
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 20 April 2020
- Proposed online date
- May 2022
- Came online
- May 2022
Location
Marker shows the centre of Bay County; the queue data does not give exact sites.
Other requests in Bay County
- Battery storage project 620, Bay CountyBattery storage · 400 MW · in study
- Solar project 281, Bay CountySolar · 74.9 MW · built
- Solar project 328B, Bay CountySolar · 50.0 MW · built
- Solar project 419A, Bay CountySolar · 24.5 MW · built
- Gas project IC-758, Bay CountyGas · 741 MW · withdrawn
- Battery storage project 621, Bay CountyBattery storage · 200 MW · withdrawn
- Solar project IC-710, Bay CountySolar · 65.0 MW · withdrawn
- Solar project IC-657, Bay CountySolar · 50.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem