United States › Grid › Interconnection queues › Florida
BATTERY STORAGE · SOUTHEASTBattery storage project 620, Bay County
Battery storage project 620, Bay County is a 400 MW battery storage request in interconnection study in the Southeast interconnection queue, in Bay County, Florida, connecting to Florida Power & Light.
Queue statusIn planning
- PlanningQueued Jan 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jan 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 620
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Florida Power & Light
- Developer
- FPL
- Connection point (POI)
- Lansing Smith Plant - Bay County
- Location
- Bay County, Florida
- Technology
- Battery: 400 MW
- Total requested
- 400 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Active
- Entered queue
- 8 January 2024
- Proposed online date
- January 2026
Location
Marker shows the centre of Bay County; the queue data does not give exact sites.
Other requests in Bay County
- Solar project 281, Bay CountySolar · 74.9 MW · built
- Solar project 282, Bay CountySolar · 74.9 MW · built
- Solar project 328B, Bay CountySolar · 50.0 MW · built
- Solar project 419A, Bay CountySolar · 24.5 MW · built
- Gas project IC-758, Bay CountyGas · 741 MW · withdrawn
- Battery storage project 621, Bay CountyBattery storage · 200 MW · withdrawn
- Solar project IC-710, Bay CountySolar · 65.0 MW · withdrawn
- Solar project IC-657, Bay CountySolar · 50.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem