United States › Grid › Interconnection queues › New York
GAS · NYISOBethlehem Energy Center
Bethlehem Energy Center is a 350 MW gas request built and operating in the NYISO interconnection queue, in Albany County, New York, connecting to NM-NG.
Request details
- Queue ID
- 3
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- PSEG Power NY
- Connection point (POI)
- Albany 115kV
- Location
- Albany County, New York
- Technology
- Gas: 350 MW
- Total requested
- 350 MW
- Study phase
- SRIS
- Queue status
- Operational
- Entered queue
- 27 April 1998
- Came online
- July 2005
Location
Marker shows the centre of Albany County; the queue data does not give exact sites.
Other requests in Albany County
- Elevate BethlehemBattery storage · 120 MW · in study
- Bethlehem Energy CenterGas · 350 MW · built
- Bethlehem Energy Center UprateGas · 72.0 MW · built
- Bethlehem Energy Center UprateGas · 72.0 MW · built
- Albany County 2Solar · 20.0 MW · built
- Albany County 1Solar · 20.0 MW · built
- Albany County 2Solar · 20.0 MW · built
- Albany County 1Solar · 20.0 MW · built
- Albany LandfillOther · 6.4 MW · built
- Albany LandfillOther · 6.4 MW · built
- MM Albany LandfillOther · 4.0 MW · built
- New Scotland BESS (NYISO-C24-045)Battery storage · 1,350 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem