United States βΊ Grid βΊ Interconnection queues βΊ New York
OTHER Β· NYISOAlbany Landfill
Albany Landfill is a 6.4 MW other request built and operating in the NYISO interconnection queue, connecting to NM-NG.
Request details
- Queue ID
- 342
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- Albany Energy, LLC
- Connection point (POI)
- 34.5kV
- Location
- New York
- Technology
- Other: 6.4 MW
- Total requested
- 6.4 MW
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 3 September 2009
Location
Marker shows the centre of County; the queue data does not give exact sites.
Other requests in County
- Elevate BethlehemBattery storage Β· 120 MW Β· in study
- Bethlehem Energy CenterGas Β· 350 MW Β· built
- Bethlehem Energy CenterGas Β· 350 MW Β· built
- Bethlehem Energy Center UprateGas Β· 72.0 MW Β· built
- Bethlehem Energy Center UprateGas Β· 72.0 MW Β· built
- Albany County 2Solar Β· 20.0 MW Β· built
- Albany County 1Solar Β· 20.0 MW Β· built
- Albany County 2Solar Β· 20.0 MW Β· built
- Albany County 1Solar Β· 20.0 MW Β· built
- Albany LandfillOther Β· 6.4 MW Β· built
- MM Albany LandfillOther Β· 4.0 MW Β· built
- New Scotland BESS (NYISO-C24-045)Battery storage Β· 1,350 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem