United States βΊ Grid βΊ Interconnection queues βΊ New York
SOLAR Β· NYISOAlbany County 1
Albany County 1 is a 20.0 MW solar request built and operating in the NYISO interconnection queue, connecting to NM-NG.
Request details
- Queue ID
- 570
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- Hecate Energy Albany 1 LLC
- Connection point (POI)
- Long Lane - Lafarge 115kV
- Location
- New York
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Study phase
- SIS, FS
- Queue status
- Operational
- Entered queue
- 17 August 2016
Location
Marker shows the centre of County; the queue data does not give exact sites.
Other requests in County
- Elevate BethlehemBattery storage Β· 120 MW Β· in study
- Bethlehem Energy CenterGas Β· 350 MW Β· built
- Bethlehem Energy CenterGas Β· 350 MW Β· built
- Bethlehem Energy Center UprateGas Β· 72.0 MW Β· built
- Bethlehem Energy Center UprateGas Β· 72.0 MW Β· built
- Albany County 2Solar Β· 20.0 MW Β· built
- Albany County 1Solar Β· 20.0 MW Β· built
- Albany County 2Solar Β· 20.0 MW Β· built
- Albany LandfillOther Β· 6.4 MW Β· built
- Albany LandfillOther Β· 6.4 MW Β· built
- MM Albany LandfillOther Β· 4.0 MW Β· built
- New Scotland BESS (NYISO-C24-045)Battery storage Β· 1,350 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem