πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Black Creek Solar

Black Creek Solar is a 150 MW solar request withdrawn in the ERCOT interconnection queue, in Frio County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2022 (completed)
  2. Withdrawn / abandonedMar 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0383
Grid region
ERCOT (Texas)
Developer
Akuo US Development LLC
Connection point (POI)
Tap 138kV 8221 BIG FOOT - 5827 MOORE SWITCHING STATION
Location
Frio County, Texas
Technology
Solar: 150 MW
Total requested
150 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
5 January 2022
Proposed online date
October 2025
Withdrawn
March 2023

Location

Marker shows the centre of Frio County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Frio County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem