United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTBlack Creek Solar
Black Creek Solar is a 150 MW solar request withdrawn in the ERCOT interconnection queue, in Frio County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2022 (completed)
- Withdrawn / abandonedMar 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 23INR0383
- Grid region
- ERCOT (Texas)
- Developer
- Akuo US Development LLC
- Connection point (POI)
- Tap 138kV 8221 BIG FOOT - 5827 MOORE SWITCHING STATION
- Location
- Frio County, Texas
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 5 January 2022
- Proposed online date
- October 2025
- Withdrawn
- March 2023
Location
Marker shows the centre of Frio County; the queue data does not give exact sites.
Other requests in Frio County
- Jukebox SolarSolar Β· 281 MW Β· in study
- Morrow Lake StorageSolar + storage Β· 201 MW Β· in study
- Hamlet Solar SLFSolar + storage Β· 201 MW Β· in study
- Hamlet Storage SLFSolar + storage Β· 201 MW Β· in study
- Dilley SolarSolar Β· 201 MW Β· in study
- Bunting Solar ProjectSolar Β· 126 MW Β· in study
- Frio FarmSolar Β· 107 MW Β· in study
- Rockpile StorageBattery storage Β· 104 MW Β· in study
- Horizon SolarSolar Β· 204 MW Β· built
- Morrow Lake SolarSolar + storage Β· 201 MW Β· built
- Elara SolarSolar Β· 132 MW Β· built
- Pearsall BESSBattery storage Β· 10.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem