Onshore wind project 13, Garfield County

Onshore wind project 13, Garfield County is a 200 MW onshore wind request withdrawn in the West interconnection queue, in Garfield County, Washington, connecting to Avista Utilities.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2008 (completed)
  2. Withdrawn / abandonedSep 2010 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
13
Grid region
West (non-ISO utilities)
Utility / transmission owner
Avista Utilities
Connection point (POI)
Dry Creek 230 kV Substation
Location
Garfield County, Washington
Technology
Wind: 200 MW
Total requested
200 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
16 January 2008
Proposed online date
October 2009
Withdrawn
September 2010

Location

Marker shows the centre of Garfield County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Garfield County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem