United States › Grid › Interconnection queues › Pennsylvania
SOLAR + STORAGE · PJMASD Brick Plant PA2 Solar
ASD Brick Plant PA2 Solar is a 5.0 MW solar + storage request withdrawn in the PJM interconnection queue, in Beaver County, Pennsylvania, connecting to PPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2020 (completed)
- Withdrawn / abandonedMar 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG1-330
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PPL
- Connection point (POI)
- Beavertown 12.47 kV
- Location
- Beaver County, Pennsylvania
- Technology
- Solar: 5.0 MW · Battery
- Total requested
- 5.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
- Queue status
- Withdrawn
- Entered queue
- 30 September 2020
- Proposed online date
- March 2024
- Withdrawn
- March 2022
Location
Marker shows the centre of Beaver County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Beaver County
- Battery storage project AG2-621, Beaver CountyBattery storage · 150 MW · in study
- Solar + storage project AH2-253, Beaver CountySolar + storage · 70.0 MW · in study
- Solar project AH2-063, Beaver CountySolar · 20.0 MW · in study
- Solar project AH2-064, Beaver CountySolar · 10.0 MW · in study
- Nuclear project N13, Beaver CountyNuclear · 1,630 MW · built
- Pennsylvania Chemicals Generating FacilityGas · 205 MW · built
- Beaver Valley 1Nuclear · 81.0 MW · built
- Beaver Valley 2Nuclear · 77.0 MW · built
- Coal project G541, Beaver CountyCoal · 50.0 MW · built
- Coal project G543, Beaver CountyCoal · 50.0 MW · built
- Beaver Valley Power StationNuclear · 48.0 MW · built
- Beaver Valley Power StationNuclear · 43.0 MW · built