United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

ONSHORE WIND Β· WEST

Onshore wind project 1005, Summit County

Onshore wind project 1005, Summit County is a 50.0 MW onshore wind request withdrawn in the West interconnection queue, in Summit County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2018 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1005
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Evanston-Anschutz line
Location
Summit County, Utah
Technology
Wind: 50.0 MW
Total requested
50.0 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN - LACK OF READINESS
Queue status
Withdrawn
Entered queue
15 February 2018
Proposed online date
October 2020

Location

Marker shows the centre of Summit County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Summit County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem