United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

ONSHORE WIND Β· WEST

Onshore wind project 221-B, Summit County

Onshore wind project 221-B, Summit County is a 80.0 MW onshore wind request withdrawn in the West interconnection queue, in Summit County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2008 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
221-B
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Thief Creek - Evanston substations
Location
Summit County, Utah
Technology
Wind: 80.0 MW
Total requested
80.0 MW
Service type
Network resource (NRIS)
Study phase
REMOVED-LACK OF PROGRESS
Queue status
Withdrawn
Entered queue
20 May 2008
Proposed online date
July 2011

Location

Marker shows the centre of Summit County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Summit County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem