United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

ONSHORE WIND Β· WEST

Onshore wind project 221-C, Summit County

Onshore wind project 221-C, Summit County is a 50.0 MW onshore wind request withdrawn in the West interconnection queue, in Summit County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2008 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
221-C
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Thief Creek - Evanston substations
Location
Summit County, Utah
Technology
Wind: 50.0 MW
Total requested
50.0 MW
Service type
Network resource (NRIS)
Study phase
WITHDRAWN BY CUSTOMER
Queue status
Withdrawn
Entered queue
20 May 2008
Proposed online date
December 2011

Location

Marker shows the centre of Summit County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Summit County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem