United States βΊ Grid βΊ Interconnection queues βΊ Utah
SOLAR Β· WESTSolar project S0019, Summit County
Solar project S0019, Summit County is a 50.0 MW solar request withdrawn in the West interconnection queue, in Summit County, Utah, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2022 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- S0019
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- Evanston-Anschutz transmission line
- Location
- Summit County, Utah
- Technology
- Solar: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 22 December 2022
- Proposed online date
- December 2025
Location
Marker shows the centre of Summit County; the queue data does not give exact sites.
Other requests in Summit County
- Onshore wind project 786, Summit CountyOnshore wind Β· 100 MW Β· agreement signed
- Onshore wind project 221-B, Summit CountyOnshore wind Β· 80.0 MW Β· withdrawn
- Onshore wind project 221-A, Summit CountyOnshore wind Β· 80.0 MW Β· withdrawn
- Onshore wind project 221-C, Summit CountyOnshore wind Β· 50.0 MW Β· withdrawn
- Onshore wind project 1005, Summit CountyOnshore wind Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem