Solar project S0019, Summit County

Solar project S0019, Summit County is a 50.0 MW solar request withdrawn in the West interconnection queue, in Summit County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
S0019
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Evanston-Anschutz transmission line
Location
Summit County, Utah
Technology
Solar: 50.0 MW
Total requested
50.0 MW
Service type
Energy only (ERIS)
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
22 December 2022
Proposed online date
December 2025

Location

Marker shows the centre of Summit County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah