United States β€Ί Grid β€Ί Interconnection queues β€Ί Maine

SOLAR Β· ISO-NE

Saco Solar

Saco Solar is a 19.6 MW solar request withdrawn in the ISO-NE interconnection queue, in York County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2019 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. ConsentedJul 2024 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
896
Grid region
ISO-NE (New England)
Connection point (POI)
CMPCO 34.5kV Louden Substation Saco, Maine
Location
York County, Maine
Technology
Solar: 19.6 MW
Total requested
19.6 MW
Service type
Energy only (ERIS)
Study phase
Executed
Queue status
Withdrawn
Entered queue
17 July 2019
Agreement signed
24 July 2024
Proposed online date
July 2026
Withdrawn
December 2025

Location

Marker shows the centre of York County; the queue data does not give exact sites.

Power plants in Maine Β· Transmission lines in Maine

Other requests in York County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem