BATTERY STORAGE Β· SPP

Battery storage project GEN-2018-085, Bailey County

Battery storage project GEN-2018-085, Bailey County is a 74.0 MW battery storage request withdrawn in the SPP interconnection queue, in Bailey County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2018 (completed)
  2. Withdrawn / abandonedMay 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2018-085
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Roosevelt-Tolk 230kV line
Location
Bailey County, Texas
Technology
Battery: 74.0 MW
Total requested
74.0 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
21 November 2018
Proposed online date
December 2019
Withdrawn
May 2022

Location

Marker shows the centre of Bailey County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Bailey County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem