SOLAR + STORAGE Β· WESTVS90SB
VS90SB is a 90.0 MW solar + storage request withdrawn in the West interconnection queue, in Dona Ana County, New Mexico, connecting to El Paso Electric Company.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2025 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Q25-LG-5-29
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- El Paso Electric Company
- Connection point (POI)
- Vado-Salopek 115 kV line
- Location
- Dona Ana County, New Mexico
- Technology
- Solar: 90.0 MW Β· Battery
- Total requested
- 90.0 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 29 May 2025
- Proposed online date
- November 2029
Location
Marker shows the centre of Dona Ana County; the queue data does not give exact sites.
Power plants in New Mexico Β· Transmission lines in New Mexico
Other requests in Dona Ana County
- VE100S ProjectSolar + storage Β· 100 MW Β· agreement signed
- VE50S ProjectSolar + storage Β· 50.0 MW Β· agreement signed
- Geothermal project IA-PNM-2015-01, DoβΒ±a Ana Cty CountyGeothermal Β· 29.0 MW Β· agreement signed
- Va400BBattery storage Β· 400 MW Β· in study
- Ve-DL-195SBSolar + storage Β· 195 MW Β· in study
- Ve-DL-150SBSolar + storage Β· 150 MW Β· in study
- Geothermal project IA-PNM-2014-04, Dona Ana Cty CountyGeothermal Β· 29.0 MW Β· in study
- D150S ProjectSolar + storage Β· 150 MW Β· suspended
- VS75SBSolar + storage Β· 75.0 MW Β· suspended
- DS90SSolar Β· 90.0 MW Β· withdrawn
- HJ73SB ProjectSolar + storage Β· 73.0 MW Β· withdrawn
- ST70S ProjectSolar + storage Β· 70.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem