SOLAR + STORAGE · WESTHJ73SB Project
HJ73SB Project is a 73.0 MW solar + storage request withdrawn in the West interconnection queue, in Dona Ana County, New Mexico, connecting to El Paso Electric Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2021 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- LG-21-9-4
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- El Paso Electric Company
- Connection point (POI)
- Hatch-Jornada 115 kV
- Location
- Dona Ana County, New Mexico
- Technology
- Solar: 73.0 MW · Battery
- Total requested
- 73.0 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 30 September 2021
- Proposed online date
- December 2024
Location
Marker shows the centre of Dona Ana County; the queue data does not give exact sites.
Power plants in New Mexico · Transmission lines in New Mexico
Other requests in Dona Ana County
- VE100S ProjectSolar + storage · 100 MW · agreement signed
- VE50S ProjectSolar + storage · 50.0 MW · agreement signed
- Geothermal project IA-PNM-2015-01, Do√±a Ana Cty CountyGeothermal · 29.0 MW · agreement signed
- Va400BBattery storage · 400 MW · in study
- Ve-DL-195SBSolar + storage · 195 MW · in study
- Ve-DL-150SBSolar + storage · 150 MW · in study
- Geothermal project IA-PNM-2014-04, Dona Ana Cty CountyGeothermal · 29.0 MW · in study
- D150S ProjectSolar + storage · 150 MW · suspended
- VS75SBSolar + storage · 75.0 MW · suspended
- DS90SSolar · 90.0 MW · withdrawn
- VS90SBSolar + storage · 90.0 MW · withdrawn
- ST70S ProjectSolar + storage · 70.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem