United States βΊ Grid βΊ Interconnection queues βΊ New Mexico
SOLAR + STORAGE Β· WESTVS75SB
VS75SB is a 75.0 MW solar + storage request suspended in the West interconnection queue, in Dona Ana County, New Mexico, connecting to El Paso Electric Company.
- PlanningQueued Sep 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- LG-22-9-7
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- El Paso Electric Company
- Connection point (POI)
- Salopek-Vado 115kV line
- Location
- Dona Ana County, New Mexico
- Technology
- Solar: 75.0 MW Β· Battery
- Total requested
- 75.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Facility Study
- Queue status
- Suspended
- Entered queue
- 30 September 2022
- Proposed online date
- December 2026
Location
Marker shows the centre of Dona Ana County; the queue data does not give exact sites.
Power plants in New Mexico Β· Transmission lines in New Mexico
Other requests in Dona Ana County
- VE100S ProjectSolar + storage Β· 100 MW Β· agreement signed
- VE50S ProjectSolar + storage Β· 50.0 MW Β· agreement signed
- Geothermal project IA-PNM-2015-01, DoβΒ±a Ana Cty CountyGeothermal Β· 29.0 MW Β· agreement signed
- Va400BBattery storage Β· 400 MW Β· in study
- Ve-DL-195SBSolar + storage Β· 195 MW Β· in study
- Ve-DL-150SBSolar + storage Β· 150 MW Β· in study
- Geothermal project IA-PNM-2014-04, Dona Ana Cty CountyGeothermal Β· 29.0 MW Β· in study
- D150S ProjectSolar + storage Β· 150 MW Β· suspended
- DS90SSolar Β· 90.0 MW Β· withdrawn
- VS90SBSolar + storage Β· 90.0 MW Β· withdrawn
- HJ73SB ProjectSolar + storage Β· 73.0 MW Β· withdrawn
- ST70S ProjectSolar + storage Β· 70.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem